
Breaking
Moshe Dayan-Herzliya train frequency to fall on October 28-29
According to an Israel Railways notice reported by Channel 14, work near Rishon LeZion will temporarily reduce peak-hour services on the Moshe Dayan-Herzliya route via the Sharon loop on October 28 and 29.
· Source: Channel 14. Archive photo: Yossi Aloni / Flash 90
According to an Israel Railways notice reported by Channel 14, work near Rishon LeZion will temporarily reduce peak-hour services on the Moshe Dayan-Herzliya route via the Sharon loop on October 28 and 29.
Infrastructure and safety work near Rishon LeZion is expected to reduce peak-hour train frequency on Wednesday and Thursday, October 28 and 29. Channel 14 reported the changes, citing Israel Railways.
The notice says two trains per hour will run on the Rishon LeZion Moshe Dayan-Herzliya route via the Sharon loop, instead of three to four. Some Beer Sheva Central-Herzliya trains will add stops in Holon and Bat Yam. Passengers should check the updated timetable on the railway website or app before traveling.
Source: Channel 14


